Wijaya, I Gede Anggi, and I Made Kariyana. “PENGARUH PERBANDINGAN PRODUKTIVITAS JAM KERJA NORMAL DAN LEMBUR PADA PEKERJAAN PEMBESIAN DAN BEKISTING (Studi Kasus : Proyek Jembatan Boug Deuker Pejeng Klusu, Gianyar, Bali)”. Jurnal Wastuloka 1, no. 1 (July 10, 2023): 45-50. Accessed September 8, 2024. https://ojs.unr.ac.id/index.php/wastuloka/article/view/1056.