[1]
I. G. A. Wijaya and I. M. Kariyana, “PENGARUH PERBANDINGAN PRODUKTIVITAS JAM KERJA NORMAL DAN LEMBUR PADA PEKERJAAN PEMBESIAN DAN BEKISTING (Studi Kasus : Proyek Jembatan Boug Deuker Pejeng Klusu, Gianyar, Bali)”, wastuloka, vol. 1, no. 1, pp. 45-50, Jul. 2023.