Wijaya, I. G. A., & Kariyana, I. M. (2023). PENGARUH PERBANDINGAN PRODUKTIVITAS JAM KERJA NORMAL DAN LEMBUR PADA PEKERJAAN PEMBESIAN DAN BEKISTING (Studi Kasus : Proyek Jembatan Boug Deuker Pejeng Klusu, Gianyar, Bali). Jurnal Wastuloka, 1(1), 45-50. Retrieved from https://ojs.unr.ac.id/index.php/wastuloka/article/view/1056