Indramanik, Ida Bagus Gede, I Komang Alit Astrawan, and I Putu Bayu Hendrawan. “PENGARUH FAKTOR PENYEBAB CHANGE ORDER TERHADAP WAKTU PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI KABUPATEN BADUNG”. Jurnal Teknik Gradien 11, no. 1 (November 5, 2019): 16–31. Accessed May 14, 2026. https://ojs.unr.ac.id/index.php/teknikgradien/article/view/278.