[1]
Sunatha, I.G.N., Ritaka Wangsa, A.A.R., Praganingrum, T.I. and Loviani, P.M. 2023. KINERJA BIAYA DAN WAKTU PROYEK DENGAN METODE EARNED VALUE MANAGEMENT: (Studi Kasus: Pembangunan Gedung Dekanat Fakultas Kedokteran Udayana). Jurnal Teknik Gradien. 15, 02 (Oct. 2023), 39–47. DOI:https://doi.org/10.47329/teknik_gradien.v15i02.1085.